Forest City @ The Yards Parking Lots
As subcontractor to Forest City, Flippo built three adjacent parking lots at National Stadium. The project was completed in two and a half months and consisted of importing and placing 8600 CY of fill and 22,600 SY of asphalt paving to create 766 parking spaces with all associated storm piping, concrete hardscaping, lighting, fencing and landscaping.
W.A. Chester @ NW Substation 228
As subcontractor to W.A. Chester, Flippo furnished and installed eight pre-cast and one cast-in-place manholes. This project included furnishing and installing hand-holes in the sidewalk at each manhole location; furnishing and installing 2” PVC between the manholes and hand-holes; trench excavation for pipe installation; pipe installation; and permanent paving.
FAM @ I-66 Bridges Bull Run & Sudley Road
As a subcontractor to FAM Construction, Flippo was responsible for the construction and installation of two new bridges with pre-cast bulb tee girders and concrete deck. The Project included installation of new and replacement of existing storm drain pipeline; construction of curb and gutter and sidewalks; and mass grading.
FAM @ Cedar Lane Water Main Relocation
Pepco @ 3400 Benning Road
As general contractor to Pepco, Flippo was responsible for the removal and replacement of existing storm drain pipeline; construction of pipe culverts and box culverts and water quality structures. Work included demolishing existing pipes and grate inlets; erosion and sediment control and excavation. Project was designed to remediate soil “hot spots”.
Fairfax County, VA
Flippo has been the general contractor to the Fairfax County, VA Department of Public Works, for numerous projects. A few of these projects are highlighted below.
Norman Cole WWTP
furnished and install a pedestrian gate and six square yards of standard sidewalk.
Langley School Force Main
Wellington II Pump Station
Integrated Sewer Metering Improvements
This project includes the rehabilitation of four sanitary sewer metering vaults. Work included the removal of existing control panels, conduits and metering equipment, rehabilitation of the interior of the vaults with a cementitious coating and epoxy liner system, installation of new control panels and conduit, and reinstallation of flow metering devices.[/caption]placement of two existing pneumatic ejector pumps with two submersible grinder pumps; installation of a cast-in-place valve vault; and rehabilitation of 430 linear feet of 8-inch gravity sewer.
Annual Contract
Waterway Drive S-Line Replacement
Waynewood II
Flatlick Ph 1 & 2
Task Order issued under 2040. Project consisted of using cured-in-place pipe liner to rehabilitate 2,525 linear feet of existing 24-inch sewer and 651 linear feet of existing 15-inch sewer and line 11 existing manholes through the Flatlick Branch stream in Chantilly, VA. The project also included a bypass pumping system, approximately 3,000 linear feet of access road, and approximately six tree removals.
Pentagon Storm Drain Repairs
Major wet and dry utility relocations and cast-in-place concrete portal to accommodate air rights over interstate I-395 for the construction of three city blocks and 2.2 million square foot complex of office, retail, residential mixed-use.
As subcontractor to CCI Utility and Construction Services, LLC, Flippo was responsible for the removal and replacement of an existing curb inlet. Flippo was also responsible for the demolition and disposal of an existing storm drain structure and 64 linear feet of storm drain pipe.
W.A. Chester @ Rt. 1 & Potomac Yards
As subcontractor to W.A. Chester, Flippo, on an emergency basis, assisted in correcting an issue with a Dominion Virginia Power 230KV line. Development in the area over recent years had resulted in the removal of cover in some areas of the oil filled pipeline, which created “hot spots” along the line. Flippo excavated down to the existing Fluidized Thermal Backfill (FTB), and then placed an additional 12VF of FTB to reach the desired grade needed to efficiently dissipate the heat generated by the line.
Rt. 28 @ Wellington
As general contractor to VDOT, Flippo was responsible for constructing a concrete bridge on Wellington Road over Route 28 in Manassas, Virginia. The Project included water main and sewer pipe installation; duct bank, storm water pipe and drainage structures; pile driving; reinforcing steel installation; structural steel erection; placement of precast concrete structures; erosion control; curb, gutter, and sidewalk paving; clearing and grubbing; concrete retaining walls; diversion structures; grading; and concrete and asphalt paving.
FAM @ Stringfellow Water Main Relocation
FAM @ Rt. 29 Bridges
Capitol Crossing
DCWASA Large Valve Replacement #13
Forest City @ The Yards Parking Lots
As subcontractor to Forest City, Flippo built three adjacent parking lots at National Stadium. The project was completed in two and a half months and consisted of importing and placing 8600 CY of fill and 22,600 SY of asphalt paving to create 766 parking spaces with all associated storm piping, concrete hardscaping, lighting, fencing and landscaping.
W.A. Chester @ NW Substation 228
As subcontractor to W.A. Chester, Flippo furnished and installed eight pre-cast and one cast-in-place manholes. This project included furnishing and installing hand-holes in the sidewalk at each manhole location; furnishing and installing 2” PVC between the manholes and hand-holes; trench excavation for pipe installation; pipe installation; and permanent paving.
FAM @ I-66 Bridges Bull Run & Sudley Road
As a subcontractor to FAM Construction, Flippo was responsible for the construction and installation of two new bridges with pre-cast bulb tee girders and concrete deck. The Project included installation of new and replacement of existing storm drain pipeline; construction of curb and gutter and sidewalks; and mass grading.
FAM @ Cedar Lane Water Main Relocation
Pepco @ 3400 Benning Road
As general contractor to Pepco, Flippo was responsible for the removal and replacement of existing storm drain pipeline; construction of pipe culverts and box culverts and water quality structures. Work included demolishing existing pipes and grate inlets; erosion and sediment control and excavation. Project was designed to remediate soil “hot spots”.
Fairfax County, VA
Flippo has been the general contractor to the Fairfax County, VA Department of Public Works, for numerous projects. A few of these projects are highlighted below.
Norman Cole WWTP
furnished and install a pedestrian gate and six square yards of standard sidewalk.
Langley School Force Main
Wellington II Pump Station
Integrated Sewer Metering Improvements
This project includes the rehabilitation of four sanitary sewer metering vaults. Work included the removal of existing control panels, conduits and metering equipment, rehabilitation of the interior of the vaults with a cementitious coating and epoxy liner system, installation of new control panels and conduit, and reinstallation of flow metering devices.[/caption]placement of two existing pneumatic ejector pumps with two submersible grinder pumps; installation of a cast-in-place valve vault; and rehabilitation of 430 linear feet of 8-inch gravity sewer.
Annual Contract
Waterway Drive S-Line Replacement
Waynewood II
Flatlick Ph 1 & 2
Task Order issued under 2040. Project consisted of using cured-in-place pipe liner to rehabilitate 2,525 linear feet of existing 24-inch sewer and 651 linear feet of existing 15-inch sewer and line 11 existing manholes through the Flatlick Branch stream in Chantilly, VA. The project also included a bypass pumping system, approximately 3,000 linear feet of access road, and approximately six tree removals.
Pentagon Storm Drain Repairs
Major wet and dry utility relocations and cast-in-place concrete portal to accommodate air rights over interstate I-395 for the construction of three city blocks and 2.2 million square foot complex of office, retail, residential mixed-use.
As subcontractor to CCI Utility and Construction Services, LLC, Flippo was responsible for the removal and replacement of an existing curb inlet. Flippo was also responsible for the demolition and disposal of an existing storm drain structure and 64 linear feet of storm drain pipe.
W.A. Chester @ Rt. 1 & Potomac Yards
As subcontractor to W.A. Chester, Flippo, on an emergency basis, assisted in correcting an issue with a Dominion Virginia Power 230KV line. Development in the area over recent years had resulted in the removal of cover in some areas of the oil filled pipeline, which created “hot spots” along the line. Flippo excavated down to the existing Fluidized Thermal Backfill (FTB), and then placed an additional 12VF of FTB to reach the desired grade needed to efficiently dissipate the heat generated by the line.
Rt. 28 @ Wellington
As general contractor to VDOT, Flippo was responsible for constructing a concrete bridge on Wellington Road over Route 28 in Manassas, Virginia. The Project included water main and sewer pipe installation; duct bank, storm water pipe and drainage structures; pile driving; reinforcing steel installation; structural steel erection; placement of precast concrete structures; erosion control; curb, gutter, and sidewalk paving; clearing and grubbing; concrete retaining walls; diversion structures; grading; and concrete and asphalt paving.